The Cikarang Listrindo power plant
4 min read

KSB in Indonesia: Keeping one of the most important power plants running

Supplying the backup pumps for the boiler feedwater applications at Cikarang Listrindo in Indonesia was a challenging task. Meant to take over for the main pumps during maintenance, these backup pumps are crucial to ensure the uninterrupted operation of our customer’s power plant.

Among the major challenges of this project were that the new pumps needed to fit into the existing mounting points and be able to work in unison with the existing pumps on site. Furthermore, the supplied backup pumps also needed to match the required operating conditions of the existing pumps.

Thanks to the in-depth know-how of our experts on site, KSB Indonesia was able to solve these and many more challenges, which came up during the process.

Supplying the backup pumps for the boiler feedwater applications at Cikarang Listrindo in Indonesia was a challenging task. Meant to take over for the main pumps during maintenance, these backup pumps are crucial to ensure the uninterrupted operation of our customer’s power plant.

Among the major challenges of this project were that the new pumps needed to fit into the existing mounting points and be able to work in unison with the existing pumps on site. Furthermore, the supplied backup pumps also needed to match the required operating conditions of the existing pumps.

Thanks to the in-depth know-how of our experts on site, KSB Indonesia was able to solve these and many more challenges, which came up during the process.

The project

Backing up the main pump of one of Indonesias TOP power plants  

Cikarang Listrindo is one of the major independent power plants in Indonesia, as well as one of KSB’s biggest customers, with several KSB products installed on site. Recently, KSB successfully signed a contract with PT. Cikarang Listrindo Tbk. for a significant overhaul of six units of HGC 5/11 boiler feedwater pumps, along with the spare parts for those pumps for the next three years.

The HGC 5/11 pump at Cikarang Listrindo

The HGC 5/11 pump at Cikarang Listrindo

The client

KSB for Cikarang Listrindo

Cikarang Listrindo is one of the most important energy suppliers in Indonesia. Established in 1993, it is the longest-operating independent power producer in the country.

The company generates an installed capacity of 1,144 MW in a conventional power plant and 12.5 MWp in a solar power plant, supplying electricity to both PLN (the state electricity company) and one of the largest and most developed industrial areas in Indonesia.

Cikarang Listrindo also supports the government in promoting renewable energy in Indonesia, particularly focusing on solar energy and biomass projects.

Since December 2019, Cikarang Listrindo has been using biofuel at the Babelan power plant to reduce coal usage. In 2021, the company installed a biomass processing system in the same coal-fired power plant to reduce greenhouse gas emissions.

The challenge

Matching the pumps at Cikarang Listrindo

Cikarang Listrindo supplies one of the country's largest and most influential industrial areas, so the systems are constantly running at full capacity. Therefore, it is impossible to halt the functioning of the plant for maintenance work.

For this project, the main pump required a general overhaul. A new HGC 5/11 pump served as a backup.

To ensure the high-pressure centrifugal pump could take over, the pump bracket had to be fitted with the existing main pump base frame and work with the same characteristic curve as the main pump.  

The solution

KSB impresses with performance and price

The KSB SupremeServ-Team impressed Cikarang Listrindo with its exceptional service capabilities, swiftly adjusting the backup pump thanks to its fast support, extensive maintenance experience, and in-depth application know-how.

Another key factor was the competitive pricing, which ultimately won over the customer.

Data | Facts | Figures

Place: Muara Bhakti Village, Sub district of Babelan, District of Bekasi, West Java, Indonesia

Client: PT Cikarang Listrindo

Year of establishment: 1993

Commissioned: 2016

Area of application: Motor Driven Boiler Feed Pump